This project will widen Pawnee and Hydraulic to a five lane roadway with two lanes in each direction and a center two-way turn lane. The project will also construct drainage improvements along with sidewalk on both sides of Pawnee. The intersection at Hydraulic will be reconstructed to include left turn lanes on Hydraulic